|
1
|
2
|
3
|
4
|
|
Planning Sessions
|
Accomplished one of
the assigned tasks
|
Accomplished two of
the assigned tasks
|
Accomplished three
of the assigned tasks
|
Created a design for
machine that had measurements. Determined materials
and suppliers.
|
____
|
Building Sessions
|
Group wasted 3/4 of
their time and nothing is complete or tested.
|
Group was on task 1/2
of the time and completed some tasks, but machine is
unfinished.
|
Group has used time
reasonably well and the machine is finished but
|
Machine is finished.
It has been tested and fixed with problem solving. Group
was on task 90% of the time.
|
____
|
The machine is constructed
of 4 unique simple machines.
|
The machine is constructed
of 4 unique simple machines.
|
The machine is constructed
of only 2 unique simple machines.
|
The machine is constructed
of only 3 unique simple machines.
|
The machine is constructed
of 4 unique simple machines.
|
____
|
The raw egg arrives
at ground level with no damage.
|
The raw egg arrives
at ground level with serious damage and leaking.
|
The raw egg arrives
at ground level with many cracks, but no leaking.
|
The raw egg arrives
at ground level with only a slight crack, no leaking.
|
The raw egg arrives
at ground level with no damage.
|
____
|
The machine's size
and movement parameters were met.
|
The machine is too
large and or the egg stalls many times throughout the
trip.
|
The egg stalls once
and the machine is too large.
|
The egg stalls once
or the machine is the wrong size in 1 dimension.
|
The egg does not stall
anywhere in the machine. The machine is not bigger then
1 meter by 1 meter by counter height.
|
____
|
|
|
|
|
Total---->
|
____
|