Egg Roll Project
Name: ___________________ Teacher:
Date : ___________________ Title of Work: ___________________
 
Criteria
Points
1
2
3
4
 
Planning Sessions
Accomplished one of the assigned tasks
Accomplished two of the assigned tasks
Accomplished three of the assigned tasks
Created a design for machine that had measurements. Determined materials and suppliers.
____
Building Sessions
Group wasted 3/4 of their time and nothing is complete or tested.
Group was on task 1/2 of the time and completed some tasks, but machine is unfinished.
Group has used time reasonably well and the machine is finished but
Machine is finished. It has been tested and fixed with problem solving. Group was on task 90% of the time.
____
The machine is constructed of 4 unique simple machines.
The machine is constructed of 4 unique simple machines.
The machine is constructed of only 2 unique simple machines.
The machine is constructed of only 3 unique simple machines.
The machine is constructed of 4 unique simple machines.
____
The raw egg arrives at ground level with no damage.
The raw egg arrives at ground level with serious damage and leaking.
The raw egg arrives at ground level with many cracks, but no leaking.
The raw egg arrives at ground level with only a slight crack, no leaking.
The raw egg arrives at ground level with no damage.
____
The machine's size and movement parameters were met.
The machine is too large and or the egg stalls many times throughout the trip.
The egg stalls once and the machine is too large.
The egg stalls once or the machine is the wrong size in 1 dimension.
The egg does not stall anywhere in the machine. The machine is not bigger then 1 meter by 1 meter by counter height.
____
       
Total---->
____

Teacher Comments:

 


This rubric is from www.TeacherJet.com