Math Measurement Lesson
Name: ___________________ Teacher:
Date : ___________________ Title of Work: ___________________
 
Criteria
Points
1
2
3
4
 
Whole-Group Participation during instruction
After warning, student remained engaged and participated in the learning less than 50% of the time.
After warning, student remained engaged and participated in the learning 75% of the time.
Student remained engaged and participated in the learning 90% of the time.
Student remained engaged and participated in the learning 100% of the time.
____
Partner or Group Participation building scale model of the solar system
Student was cooperative and attempting to measure accurately during the activity less than 50% of the time.
Student was cooperative and attempting to measure accurately during the activity 75% of the time.
Student was cooperative and accurately measured during the activity 90% of the time.
Student was cooperative and accurately measured during the activity 100% of the time.
____
Student summarized the learning and the EQ through a written response or a Venn diagram or a speech
Student attempted a product choice but summarized the learning and the EQ with less than 50% accuracy.
Student chose a product summarizing the learning and the EQ with 75% accuracy.
Student chose a product summarizing the learning and the EQ with 90% accuracy.
Student chose a product summarizing the learning and the EQ with 100% accuracy.
____
____
____
       
Total---->
____

Teacher Comments:

 


This rubric is from www.TeacherJet.com